08 · Photo Proof
Documentation lives on the task, not a separate report.
When proof_required is true, the task cannot complete without evidence captured at or after execution. Multi-photo proof may describe wide or segmented zones.
Conformance requirements
01Evidence includes a capture timestamp.02Associate every asset with task_id and completion_id.03Declare minimum and maximum photo counts.04Retention and privacy remain implementation policy.05Put proof_required on the return task, not the apply task, for a background or blocking dwell (v2.4) — evidence taken at application cannot show the contact time was met.06Proof on a return task (after_dwell_of) must be timestamped at or after the apply task's dwell_met_at, unless an exception was logged under Chapter 05.
Canonical example
JSON-LD{
"proof": {
"required": true,
"min_items": 2,
"items": [{"type": "image", "captured_at": "2026-11-23T19:10:24Z"}]
}
}Implementation notes
iDo not embed large media blobs in the plan document.
iImplementations should use durable URLs plus integrity metadata.